Boeing Whistleblower: Production Line Has “Enormous Volume Of Defects” Bolts On MAX 9 Weren’t Installed::A reader at respected airline industry site Leeham News offered a comment that suggests they have access to Boeing’s internal quality control systems, and shares details of what they saw regarding the Boeing 737 MAX 9 flown by Alaska Airlines that had a door plug detach inflight, causing rapid decompression of the aircraft. The takeaway appears to be that outsourced plane components have so many problems when they show up at the production line that Boeing’s quality control staff can’t keep up with them all.

  • yesman@lemmy.world
    link
    fedilink
    English
    arrow-up
    12
    arrow-down
    1
    ·
    10 months ago

    People who know more than me have pointed out that the the hole in the fuselage and the plug found on the ground don’t show the kind of damage you’d expect if the bolts were present and secure.

    So them being absent entirely is consistent with the publicly available evidence.

    • 2piradians@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      10 months ago

      You’d think corporations would learn from these types of failures. But no, not as long as endless growth is the overall plan. The yes men will keep cutting corners at the expense of safety and quality.

        • BakerBagel@midwest.social
          link
          fedilink
          English
          arrow-up
          0
          ·
          10 months ago

          Especially if you can get a new job before something goes wrong. Get an upper management job, strip the metaphorical walls of copper to “cut costs”, and use that on your CV to get a C-suite job somewhere else.

          • Patches@sh.itjust.works
            link
            fedilink
            English
            arrow-up
            1
            ·
            10 months ago

            What do you mean goes wrong?

            Boring still isn’t suffering for this. They’ve made their money and will continue to make more.

  • ExLisper@linux.community
    link
    fedilink
    English
    arrow-up
    10
    ·
    10 months ago

    For anyone interested what happened (according to some anonymous whistle-blower):

    They had to remove the door plug to replace damaged pressure seal but didn’t want to run QA on the plug after installing it back so they didn’t mark it as ‘removed’ in the tracking system, they simply treated it as door that were “opened”. Parts were missed when inserting the plug, QA didn’t check because it wasn’t in the system, plane was delivered to the client. The rest is history.

    There’ s a lot of backstory to it but that’s the direct cause. Supposedly.

  • Bluefalcon@discuss.tchncs.de
    link
    fedilink
    English
    arrow-up
    3
    arrow-down
    2
    ·
    10 months ago

    Time to start arresting people at the top and work your way down. Also Pete Buttigieg needs to answer why it has taken so long for the grounding of the 737 Max 9.

  • 9tr6gyp3@lemmy.world
    link
    fedilink
    English
    arrow-up
    1
    ·
    edit-2
    10 months ago

    To be fair, the defects SHOULD be found in the production line, but not in the finished product.

    • neptune@dmv.social
      link
      fedilink
      English
      arrow-up
      0
      ·
      10 months ago

      In something like a commercial airliner you can’t afford to just catch the mistakes. You have to prevent them.

      • 9tr6gyp3@lemmy.world
        link
        fedilink
        English
        arrow-up
        1
        ·
        edit-2
        10 months ago

        In a commercial production line, there are part defects, engineering defects, assembly defects, testing defects, tool defects, etc.

        Tens of thousands of parts. Thousands of employees (some new hires). Hundreds of vendors.

        You will never prevent all defects, but you should be able to discover them before finishing production.

        A lot of these wont even be discovered until they are assembled and it fails a test or inspection point.