It was built to transport cargo through the Alps to reduce the amount of heavy trucks. Germany refuses to build their part of this project, there is not enough infrastructure to load the cargo and there is no economic incentive to do so. At least the tunnel is built, maybe it will be used to its potential sometimes in the (far) future…
Tirol is pretty tired of the trucks and I assume the tolls will rise sharply once the tunnel is ready. This will hopefully create the necessary economic incentives for Germany to built the infrastructure.
It was built to transport cargo through the Alps to reduce the amount of heavy trucks. Germany refuses to build their part of this project, there is not enough infrastructure to load the cargo and there is no economic incentive to do so. At least the tunnel is built, maybe it will be used to its potential sometimes in the (far) future…
Tirol is pretty tired of the trucks and I assume the tolls will rise sharply once the tunnel is ready. This will hopefully create the necessary economic incentives for Germany to built the infrastructure.
The toll won’t rise with the ÖVP. Kann nicht mal jemand an die Frächter denken?
Switzerland: first time?
Denmark: Oh, I am next in line!!!