• kreskin@lemmy.world
    link
    fedilink
    English
    arrow-up
    2
    ·
    7 hours ago

    Dont forget the 2000 miles of railroad that’d need to be built, much of it over frozen terrain, and a lot of it mountainous. That in itself would be an engineering marvel even before the bridge or tunnel work.