[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • Synapse@lemmy.world
    link
    fedilink
    English
    arrow-up
    22
    arrow-down
    1
    ·
    5 months ago

    Because it is actually not that simple, especially on the “cleaner” and “safer” parts.

    • Rakonat@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      5 months ago

      Theoretically the main advantage of the thorium is precisely because its safer and cleaner. When removed from its neutron source thorium quickly ceases fission and decay.