Being somewhat adjacent to that with my work, there is a good chance anything in a critical area (hopefully fields like utilities, petroleum, areas with enough energy to cause harm) have decently hardened or updated equipment where it either isn’t an issue, will stop reporting tread data correctly, or roll over to date “0” which depending on the platform with industrial equipment tends to be 1970 in my personal experience. That said, there is always the case that it will not be handled correctly and either run away or stop entirely.
“is usually written by an over worked engineer”
I’m in this post and I don’t like it.
But really these scada systems are rarely well defined by the time implementation happens. Often the architect has a great plan, but by the time it’s passed to a manager, a non-software engineer, to the product engineer to the automation team to the contractor the end result is “X data is pushed in With Y form and we use either a,b,or c date time stamp any nobody knows”